Appears in
- About
Ingredients
Ingredients |
U.S. |
Metric |
% |
|
Method
Procedure
Mixing
- Mix the starter ingredients. Let stand at shop temperature 24 hours.
- Add the first build ingredients. Ferment at 80°F(27°C) until the mixture falls back, about 3 hours.
- Repeat with the remaining builds. The second build may be omitted if the schedule does not permit. Amounts added in the